Rules:
2v2 FE Training Doubles
Training Items/Mega Stones
36 HR DQ
All Abilities
2 subs
0 recovers/2 chills
ASB Arena
Team Mowtom:
Delcatty [Nepeta] (F)
One doomed Nepeta happened to be a post-entry prototyping in a sprite whose pre-entry prototyping was an albino cat. In the new universe her players created, she was set free and wandered about for many months. She eventually met Mowtom, and he couldn't believe the cuteness that was right in front of him.
Type: Normal
Stats:
HP: 100
Atk: 4 (+)
Def: 3
SpA: 1 (-)
SpD: 2
Spe: 70
Size Class: 2
Weight Class: 3
Base Rank Total: 16
EC: 6/6
MC: 0
AC: 5/5
Attacks (30/88):
Physical
Dig
Double-Edge
Double Slap
Fake Out
Feint Attack
Frustration
Play Rough
Return
Sucker Punch
Tackle
Special
Disarming Voice
Round
Status
Assist
Attract
Baton Pass
Charm
Copycat
Double Team
Endure
Foresight
Growl
Heal Bell
Helping Hand
Protect
Simple Beam
Sing
Substitute
Tail Whip
Thunder Wave
Wish
Sos [Conkeldurr] (M)
Sos has always loved the Battle Circle trilogy. He think the idea of fighting with honor in a circle to the surrender is the epitome of life. When Mowtom found him, he sent George in to fight. The result? Sos is unquestionably loyal to the other Fighting-type. He would even disobey Mowtom if George told him to.
Type: Fighting
Stats:
HP: 100
Atk: 6 (+)
Def: 3
SpA: 1 (-)
SpD: 3
Spe: 45
Size Class: 3
Weight Class: 4
Base Rank Total: 19
EC: 9/9
MC: 0
AC: 5/5
Attacks (30/71):
Physical
Bide
Bulldoze
Chip Away
Counter
Dig
Drain Punch
Earthquake
Fire Punch
Focus Punch
Force Palm
Hammer Arm
Ice Punch
Knock Off
Low Kick
Mach Punch
Poison Jab
Pound
Rock Throw
Smack Down
Stone Edge
Thunder Punch
Wake-Up Slap
Special
Status
Endure
Focus Energy
Leer
Protect
Substitute
Taunt
Toxic
Wide Guard
Mzee [Torterra] (F)
Mzee can trace her lineage back to the Ancient One himself, Mzee Hippofriend. When she was just hatched, Mzee the younger set out on a journey to make as many kinds of friends as possible to continue her ancestor's legacy. It might help if she weren't always so serious, though...
Type: Grass / Ground
Stats:
HP: 100
Atk: 4
Def: 4
SpA: 4 (+)
SpD: 3
Spe: 48 (-) (-10% Evasion)
Size Class: 5
Weight Class: 7
Base Rank Total: 19
EC: 9/9
MC: 0
AC: 5/5
Attacks (24/82):
Physical
Bite
Body Slam
Earthquake
Razor Leaf
Sand Tomb
Seed Bomb
Superpower
Tackle
Wood Hammer
Special
Absorb
Mega Drain
Energy Ball
Grass Knot
Leaf Storm
Solar Beam
Status
Curse
Double Team
Endure
Grassy Terrain
Protect
Substitute
Wide Guard
Withdraw
Worry Seed
Team Deadfox:
Charizard [Claws] (F)
Nature: Hasty (+15% Spe, +15% Acc -1 Def)
Type: Fire/Flying
Stats:
HP: 100
Atk: Rank 3
Def: Rank 2 (-)
SpA: Rank 4
SpD: Rank 3
Spe: 115 (110*1.15)
Size Class: 3
Weight Class: 4
Base Rank Total: 20
Mega Charizard-X [Claws] (F)
Nature: Hasty (+15% Spe, +15% Acc -1 Def)
Type: Fire/Dragon
Stats:
HP: 100
Atk: Rank 5
Def: Rank 3 (-)
SpA: Rank 5
SpD: Rank 3
Spe: 115 (110*1.15)
Size Class: 3
Weight Class: 5
Base Rank Total: 24
Mega Charizard-Y [Claws] (F)
Nature: Hasty (+15% Spe, +15% Acc -1 Def)
Type: Fire/Flying
Stats:
HP: 100
Atk: Rank 4
Def: Rank 2 (-)
SpA: Rank 7
SpD: Rank 4
Spe: 115 (110*1.15)
Size Class: 3
Weight Class: 4
Base Rank Total: 25
EC: 9/9
MC: 0
AC: 5/5
Abilities: Blaze, Solar Power (Unlocked), Tough Claws (Mega-X), Drought (Mega-Y)
Attacks (38):
PHYSICAL
Beat Up
Bide
Brick Break
Counter
Crunch
Dig
Dragon Claw
Dragon Rush
Dragon Tail
Earthquake
Fire Fang
Flare Blitz
Fly
Iron Tail
Rock Slide
Scratch
Shadow Claw
Sky Drop
Thunder Punch
Wing Attack
SPECIAL
Air Slash
Ancient Power
Dragon Pulse
Dragon Rage
Ember
Fire Blast
Fire Spin
Flame Burst
Flamethrower
Heat Wave
Inferno
Solarbeam
OTHER
Dragon Dance
Endure
Growl
Smokescreen
Scary Face
Will-O-Wisp
Garchomp [Rhaegal] (M)
Nature: Hasty (+15% Spe, +16% Acc -1 Def)
Type: Dragon/Ground
Stats:
HP: 110
Atk: Rank 5
Def: Rank 2 (-)
SpA: Rank 3
SpD: Rank 3
Spe: 118 (102*1.15)
Size Class: 4
Weight Class: 4
Base Rank Total: 22
Mega Garchomp [Rhaegal] (M)
Nature: Hasty (+15% Spe, +13% Acc -1 Def)
Type: Dragon/Ground
Stats:
HP: 110
Atk: Rank 7
Def: Rank 3 (-)
SpA: Rank 5
SpD: Rank 3
Spe: 106 (92*1.15)
Size Class: 4
Weight Class: 4
Base Rank Total: 26
EC: 9/9
MC: 0
AC: 5/5
Abilities: Sand Veil, Rough Skin (Unlocked), Sand Force (Mega)
Attacks (24):
PHYSICAL
Body Slam
Bulldoze
Dig
Dragon Claw
Dragon Rush
Dual Chop
Earthquake
Fire Fang
Iron Head
Outrage
Rock Slide
Sand Tomb
Shadow Claw
Slash
Tackle
Take Down
SPECIAL
Dragon Breath
Dragon Rage
Flamethrower
Mud Shot
OTHER
Protect
Sand Attack
Sandstorm
Stealth Rock
Salamence [Viserion] (M)
Nature: Hasty (+15% Spe, +15% Acc -1 Def)
Type: Dragon/Flying
Stats:
HP: 100
Atk: Rank 5
Def: Rank 2 (-)
SpA: Rank 4
SpD: Rank 3
Spe: 115 (100*1.15)
Size Class: 4
Weight Class: 5
Base Rank Total: 22
Mega Salamence [Viserion] (M)
Nature: Hasty (+15% Spe, +22% Acc -1 Def)
Type: Dragon/Flying
Stats:
HP: 100
Atk: Rank 6
Def: Rank 4 (-)
SpA: Rank 5
SpD: Rank 3
Spe: 138 (120*1.15)
Size Class: 4
Weight Class: 5
Base Rank Total: 27
EC: 9/9
MC: 0
AC: 5/5
Abilities: Intimidate, Moxie (Unlocked), Aerilate (Mega)
Attacks (29):
PHYSICAL
Aerial Ace
Bite
Brick Break
Crunch
Double-Edge
Dragon Claw
Dragon Rush
Dragon Tail
Fire Fang
Fly
Headbutt
Iron Tail
Rage
Rock Slide
Rock Tomb
Shadow Claw
Thunder Fang
Zen Headbutt
SPECIAL
Dragon Breath
Dragon Pulse
Ember
Flamethrower
Hydro Pump
Hyper Voice
Twister
OTHER
Dragon Dance
Endure
Focus Energy
Leer
Deadfox sends out and equips
Mowtom sends out, equips, and orders
Deadfox orders
I ref
2v2 FE Training Doubles
Training Items/Mega Stones
36 HR DQ
All Abilities
2 subs
0 recovers/2 chills
ASB Arena
Team Mowtom:
Delcatty [Nepeta] (F)
One doomed Nepeta happened to be a post-entry prototyping in a sprite whose pre-entry prototyping was an albino cat. In the new universe her players created, she was set free and wandered about for many months. She eventually met Mowtom, and he couldn't believe the cuteness that was right in front of him.
Type: Normal
- Normal STAB; +1 BAP on attacks that match dominant arena type after 3 actions. Unable to have Thrash or Outrage disrupted by oncoming damage.
- This Pokemon's natural cuteness causes Pokemon of the opposite gender to be attracted to it 30% of the time after striking with a contact move.
- By default, this Pokemon has mastered Normal-type attacks and can change any attack type to have a Normal energy signature. The Pokemon's Normal-type attacks will have four (4) more Base Attack Power. Its other attacks will change their typing to Normal, retain status-inducing and other properties, and not receive the Base Attack Power boost from this ability. When toggled, there is no effect.
- The Pokemon's skin has an agent that heavily resists attempts to change its composition. It changes the accuracy of all non-damaging attacks to 50% before applying any other modifiers.
Stats:
HP: 100
Atk: 4 (+)
Def: 3
SpA: 1 (-)
SpD: 2
Spe: 70
Size Class: 2
Weight Class: 3
Base Rank Total: 16
EC: 6/6
MC: 0
AC: 5/5
Attacks (30/88):
Physical
Dig
Double-Edge
Double Slap
Fake Out
Feint Attack
Frustration
Play Rough
Return
Sucker Punch
Tackle
Special
Disarming Voice
Round
Status
Assist
Attract
Baton Pass
Charm
Copycat
Double Team
Endure
Foresight
Growl
Heal Bell
Helping Hand
Protect
Simple Beam
Sing
Substitute
Tail Whip
Thunder Wave
Wish
Sos [Conkeldurr] (M)
Sos has always loved the Battle Circle trilogy. He think the idea of fighting with honor in a circle to the surrender is the epitome of life. When Mowtom found him, he sent George in to fight. The result? Sos is unquestionably loyal to the other Fighting-type. He would even disobey Mowtom if George told him to.
Type: Fighting
- Fighting STAB; ignore weight restrictions on Circle Throw, Seismic Toss, Sky Drop, Storm Throw, Submission, and Vital Throw.
- This Pokemon is tenacious and will work ever harder when under a status condition, raising the Base Attack Power of all its physical attacks by two (2). Pokemon with Guts ignore the attack drop from burn.
- At default this Pokemon can energize all its attacks with a secondary effect (These are damaging moves that either lower the target's stats, raise the user's stats, or inflict a status condition on the target). The Base Attack Power of every move with a secondary effect increases by two (2), but they will never have their usual secondary effect. When toggled, no effect.
- The Base Attack Power of this Pokemon's "Punch" attacks is increased by two (2). (Known attacks affected: Bullet Punch, Comet Punch, Dizzy Punch, Drain Punch, Dynamic Punch, Fire Punch, Focus Punch, Hammer Arm, Ice Punch, Mach Punch, Mega Punch, Meteor Mash, Shadow Punch, Sky Uppercut, Thunder Punch, Power-Up Punch)
Stats:
HP: 100
Atk: 6 (+)
Def: 3
SpA: 1 (-)
SpD: 3
Spe: 45
Size Class: 3
Weight Class: 4
Base Rank Total: 19
EC: 9/9
MC: 0
AC: 5/5
Attacks (30/71):
Physical
Bide
Bulldoze
Chip Away
Counter
Dig
Drain Punch
Earthquake
Fire Punch
Focus Punch
Force Palm
Hammer Arm
Ice Punch
Knock Off
Low Kick
Mach Punch
Poison Jab
Pound
Rock Throw
Smack Down
Stone Edge
Thunder Punch
Wake-Up Slap
Special
Status
Endure
Focus Energy
Leer
Protect
Substitute
Taunt
Toxic
Wide Guard
Mzee [Torterra] (F)
Mzee can trace her lineage back to the Ancient One himself, Mzee Hippofriend. When she was just hatched, Mzee the younger set out on a journey to make as many kinds of friends as possible to continue her ancestor's legacy. It might help if she weren't always so serious, though...
Type: Grass / Ground
- Grass STAB; immunity to Leech Seed, Worry Seed, and all "Powder" based attacks (Poisonpowder, Powder, Rage Powder, Sleep Powder, Spore, Stun Spore). Unable to have Petal Dance disrupted by oncoming damage. Ignores Arena restrictions on Grass attacks requiring an external grass source. Bloom Command.
- Bloom Command: For the next six (6) actions, this Pokemon's "Grass," "Powder," and "Seed" status-moves will have fifteen (15) added points to their Base Accuracy (e.g. Grass Whistle goes from 55 Base Acc to 70 Base Acc). Type Exclusive commands can only be used by Pokemon that are naturally that type, and are still available if the Pokemon changes type.
Command Type: Type Exclusive | Accuracy: -- | Energy Cost: 5 | Priority: 0 | CT: None
- Bloom Command: For the next six (6) actions, this Pokemon's "Grass," "Powder," and "Seed" status-moves will have fifteen (15) added points to their Base Accuracy (e.g. Grass Whistle goes from 55 Base Acc to 70 Base Acc). Type Exclusive commands can only be used by Pokemon that are naturally that type, and are still available if the Pokemon changes type.
- Ground STAB; immune to Sandstorm. Ignores Arena restrictions on Dig and Seismic Attacks for Arenas in which any land mass exists, Evasive Digging reduced from 6 per action Energy Cost to 5 per action.
- When this Pokemon's HP is lower than 33% (flat), the Base Attack Power of any grass attack is increased by two (2). (eg Giga Drain goes from 8 to 10, Solar Beam from 12 to 14)
- This Pokemon's thick, bony outer shell prevents it from taking critical hits.
Stats:
HP: 100
Atk: 4
Def: 4
SpA: 4 (+)
SpD: 3
Spe: 48 (-) (-10% Evasion)
Size Class: 5
Weight Class: 7
Base Rank Total: 19
EC: 9/9
MC: 0
AC: 5/5
Attacks (24/82):
Physical
Bite
Body Slam
Earthquake
Razor Leaf
Sand Tomb
Seed Bomb
Superpower
Tackle
Wood Hammer
Special
Absorb
Mega Drain
Energy Ball
Grass Knot
Leaf Storm
Solar Beam
Status
Curse
Double Team
Endure
Grassy Terrain
Protect
Substitute
Wide Guard
Withdraw
Worry Seed
Team Deadfox:
Charizard [Claws] (F)
Nature: Hasty (+15% Spe, +15% Acc -1 Def)
Type: Fire/Flying
Stats:
HP: 100
Atk: Rank 3
Def: Rank 2 (-)
SpA: Rank 4
SpD: Rank 3
Spe: 115 (110*1.15)
Size Class: 3
Weight Class: 4
Base Rank Total: 20
Mega Charizard-X [Claws] (F)
Nature: Hasty (+15% Spe, +15% Acc -1 Def)
Type: Fire/Dragon
Stats:
HP: 100
Atk: Rank 5
Def: Rank 3 (-)
SpA: Rank 5
SpD: Rank 3
Spe: 115 (110*1.15)
Size Class: 3
Weight Class: 5
Base Rank Total: 24
Mega Charizard-Y [Claws] (F)
Nature: Hasty (+15% Spe, +15% Acc -1 Def)
Type: Fire/Flying
Stats:
HP: 100
Atk: Rank 4
Def: Rank 2 (-)
SpA: Rank 7
SpD: Rank 4
Spe: 115 (110*1.15)
Size Class: 3
Weight Class: 4
Base Rank Total: 25
MC: 0
AC: 5/5
Abilities: Blaze, Solar Power (Unlocked), Tough Claws (Mega-X), Drought (Mega-Y)
Attacks (38):
PHYSICAL
Beat Up
Bide
Brick Break
Counter
Crunch
Dig
Dragon Claw
Dragon Rush
Dragon Tail
Earthquake
Fire Fang
Flare Blitz
Fly
Iron Tail
Rock Slide
Scratch
Shadow Claw
Sky Drop
Thunder Punch
Wing Attack
SPECIAL
Air Slash
Ancient Power
Dragon Pulse
Dragon Rage
Ember
Fire Blast
Fire Spin
Flame Burst
Flamethrower
Heat Wave
Inferno
Solarbeam
OTHER
Dragon Dance
Endure
Growl
Smokescreen
Scary Face
Will-O-Wisp
Garchomp [Rhaegal] (M)
Nature: Hasty (+15% Spe, +16% Acc -1 Def)
Type: Dragon/Ground
Stats:
HP: 110
Atk: Rank 5
Def: Rank 2 (-)
SpA: Rank 3
SpD: Rank 3
Spe: 118 (102*1.15)
Size Class: 4
Weight Class: 4
Base Rank Total: 22
Mega Garchomp [Rhaegal] (M)
Nature: Hasty (+15% Spe, +13% Acc -1 Def)
Type: Dragon/Ground
Stats:
HP: 110
Atk: Rank 7
Def: Rank 3 (-)
SpA: Rank 5
SpD: Rank 3
Spe: 106 (92*1.15)
Size Class: 4
Weight Class: 4
Base Rank Total: 26
MC: 0
AC: 5/5
Abilities: Sand Veil, Rough Skin (Unlocked), Sand Force (Mega)
Attacks (24):
PHYSICAL
Body Slam
Bulldoze
Dig
Dragon Claw
Dragon Rush
Dual Chop
Earthquake
Fire Fang
Iron Head
Outrage
Rock Slide
Sand Tomb
Shadow Claw
Slash
Tackle
Take Down
SPECIAL
Dragon Breath
Dragon Rage
Flamethrower
Mud Shot
OTHER
Protect
Sand Attack
Sandstorm
Stealth Rock
Salamence [Viserion] (M)
Nature: Hasty (+15% Spe, +15% Acc -1 Def)
Type: Dragon/Flying
Stats:
HP: 100
Atk: Rank 5
Def: Rank 2 (-)
SpA: Rank 4
SpD: Rank 3
Spe: 115 (100*1.15)
Size Class: 4
Weight Class: 5
Base Rank Total: 22
Mega Salamence [Viserion] (M)
Nature: Hasty (+15% Spe, +22% Acc -1 Def)
Type: Dragon/Flying
Stats:
HP: 100
Atk: Rank 6
Def: Rank 4 (-)
SpA: Rank 5
SpD: Rank 3
Spe: 138 (120*1.15)
Size Class: 4
Weight Class: 5
Base Rank Total: 27
MC: 0
AC: 5/5
Abilities: Intimidate, Moxie (Unlocked), Aerilate (Mega)
Attacks (29):
PHYSICAL
Aerial Ace
Bite
Brick Break
Crunch
Double-Edge
Dragon Claw
Dragon Rush
Dragon Tail
Fire Fang
Fly
Headbutt
Iron Tail
Rage
Rock Slide
Rock Tomb
Shadow Claw
Thunder Fang
Zen Headbutt
SPECIAL
Dragon Breath
Dragon Pulse
Ember
Flamethrower
Hydro Pump
Hyper Voice
Twister
OTHER
Dragon Dance
Endure
Focus Energy
Leer
Deadfox sends out and equips
Mowtom sends out, equips, and orders
Deadfox orders
I ref
Last edited:


