• Check out the relaunch of our general collection, with classic designs and new ones by our very own Pissog!

Tournaments ADV DOU Open I [Won by Banbadoro]

Status
Not open for further replies.
op stolen and adapted from Smudge


adv-slam-png.557041



ADV Grand Slam Art by Kolohe

:rs/Deoxys-Attack: ADV Grand Slam Standings :rs/Glalie:

This is a standard ADV Doubles tournament.
See the ADV Doubles metagame thread for more information and resources, such as sample teams and viability rankings.
This tournament is single elimination.
Rounds will be best-of-3. Players may switch teams in between rounds and battles of the same set.
Matches will be played on Pokémon Showdown.
Replays must be saved and posted in the thread. Any match win reported without replays will not be counted. This is your only warning.
General tournament rules and regulations can be found here. A scheduling guide can be found here.
This tournament is part of ADV Grand Slam.




Pairings:
PandaDoux vs Banbadoro
Hugo
vs BIG WILL

Bracketmaker proof: https://www.smogon.com/bracketmaker/view/11296/

All Quarterfinals Matches must be completed by Sunday, November 19th, 10PM GMT+0.
Extensions can be provided upon request.​
 
Last edited:
op stolen and adapted from Smudge


adv-slam-png.557041



ADV Grand Slam Art by Kolohe

:rs/Deoxys-Attack: ADV Grand Slam Standings :rs/Glalie:

This is a standard ADV Doubles tournament.
See the ADV Doubles metagame thread for more information and resources, such as sample teams and viability rankings.
This tournament is single elimination.
Rounds will be best-of-3. Players may switch teams in between rounds and battles of the same set.
Matches will be played on Pokémon Showdown.
Replays must be saved and posted in the thread. Any match win reported without replays will not be counted. This is your only warning.
General tournament rules and regulations can be found here. A scheduling guide can be found here.
This tournament is part of ADV Grand Slam.




Pairings:
Hugo vs Banbadoro

All Quarterfinals Matches must be completed by Sunday, November 26th, 10PM GMT+0.
Extensions can be provided upon request.​
 
Last edited:
Status
Not open for further replies.
Back
Top