Hmm...taking both methods into consideration:
My normal delay is usually 600. This is determined by the time between the moment I soft reset and the moment I hit continue, according to the OP. `-`
My seconds are usually 14, so when I divide those two, I get about 42.857 per second. If I need a delay of 658, I'd divide 658 by 42.857 and get something around 15.353 seconds, which theoretically means I should wait that long before hitting the continue button from the soft reset, and should adjust my DS time and timer accordingly so I can hit the continue button at ~15.353 seconds while hitting the needed time for the spread as well. D:
So hypothetically, if my target was 15:10:14, I'd set the first phase of emloop's timer for ~(60 - 1.353 = 58.647) seconds and set my DS clock to a minute before the target time - but instead of reseting at the exact new minute, I would be reseting 1.353 seconds before the new minute, which would mean I'd be able to wait the extra 1.353 seconds and still hit my 15:10:14 time if my sense of timing were to be...impeccable. * u * (Staring at emloop's timer, of course. I've never used it before, but I think I get how it works...`-`;)
But then, why are the units of delay considered to be 1/60 seconds? That's just an approximation, right? D:
Sorry for such a long winded question. >_>
Thanks again for your amazing work, and of course the amazing work from the other contributors *A*;