• Check out the relaunch of our general collection, with classic designs and new ones by our very own Pissog!

Under Construction,Delaying,and Bacon Strips :D

Status
Not open for further replies.
Hi. I'm interested in:

Kurt's Shiny Thundorus :D
Timid
IV: TBD (HP Ice)
EV: 4/0/0/254/0/252
OT: Kurt
ID: 00007
AR Cloned by me

Linkino's Shiny Timid Latias
OT: Space
ID: 09105
IVs: 31/6/31/30/31/30 HP Fire

Reuniclus NN:Glubulus
Male Lv.100 Shiny
Bold Magic Guard
Leftovers
OT: Jim ID: 42521
IV: 31/17/31/31/31/31
EV: 252 HP/ 252 SpA/ 4 SpD
Moveset: Calm Mind, Psyshock, Shadowball, Recover
AR Cloned by me

I can offer:

Shiny Gyarados - Adamant
Intimidate
31/31/31/31/30/31 (HP Electric 70)
UT

Shiny Skarmory - Impish
Keen EYe
31/31/31/31/31/31
UT

Shiny Machop -Adamant
No Guard
31/31/31/31/31/31
eg move: bullet punch
UT

Shiny Azelf - Timid
31/31/31/31/31/31
UT

Shiny Gligar - Immunity (Dream World)
31/31/31/01/31/31, Impish
Egg Moves: Poison Tail, Double-Edge, Baton Pass, Agility

Movie Victini
31/31/31/31/31/31, Adamant
Special Moves: V-Create, Fusion Flare, Fusion Bolt, Searing Shot

Shiny Kyurem Pressure
31/02/31/30/31/30 HP Fire 70, Timid

Larvesta -Flame Body
31/15/30/31/30/30 HP Rock 70, Timid

Shiny Vaporeon
Bold
31/31/31/31/30/31 (HP Electric 70)
UT@Level 100 or EV'd 248 HP / 252 Def / 8 SpD (Standard EVs and moveset)

Shiny Lucario
Adamant
31/31/31/31/31/31
UT@Level 100 or 252atk/4Sp.Def/252 atk

Shiny Scizor
Adamant
31/31/31/31/31/31
Special Moves: Roost, Bug Bite, Superpower
OT: Arren
UT@Level 1 or EV'd 252 HP / 40 Atk / 216 SpD @ Level 100

Shiny Gible
Jolly 31/31/31/31/31/31
Special Moves: Stealth Rock and Outrage
OT: Spunk
UT@Level 1

Shiny Zapdos
Timid 30/15/30/31/31/31 (HP ICE 70)
Special Moves: Roost and Heat Wave
OT: Mat
UT@Level 100 or EV'd 192 HP / 64 Def / 252 Spe

Shiny Swampert
Relaxed 31/31/31/31/31/0 (I believe; if you're interested in it, I'll check the exact IV's again to make sure)
Special Moves: Stealth Rock
OT: Misty
UT@Level 100 or EV'd 240 HP / 216 Def / 52 SpD
 
hey replying to your CMT
i would love this
Xelite's #549 - Lilligant ★
(ID: 52957 | OT: JOE)
549.png
nestsb5.png

Ability: Chlorophyll | Nature: Timid
IVs: 31 | 19 | 30 | 31 | 30 | 30 [HP 70]
EVs:6 HP / 252 SAtk / 252 Speed
Moves: Toxic, Hidden Power, Stun Spore, Solarbeam
Available at: Level 100 EVd
AR Cloned by me

For arcee's shiny adamant absol!
 
Update for kids who wants to be kids

196.png
Bag_Dream_Ball_Sprite.png
DW Espeon(France)|Timid|31.30.31.31.31.31 HP Dragon

135.png
Bag_Dream_Ball_Sprite.png
DW Jolteon(France)|Modest|31.30.31.31.31.31 HP Dragon

196.png
Bag_Dream_Ball_Sprite.png
DW Espeon|Timid|31.14.30.30.30.30 HP Fight

135.png
Bag_Ultra_Ball_Sprite.png
DW Jolteon|Modest|31.30.30.31.31.31 HP IC3

136.png
Bag_Dream_Ball_Sprite.png
DW Flareon|Adamant|31.31.31.30.31.31

136.png
Bag_Pok%C3%A9_Ball_Sprite.png
DW Flareon|Adamant|31.31.31.24.30.31 (Wish/Curse)
610.png
Bag_Ultra_Ball_Sprite.png
(Shiny) Axew|Adamant|31.31.31.31.31.31

384.png
Bag_Ultra_Ball_Sprite.png
Rayqyaza(NN Senjiou)(3rd Gen)|Hasty|30.31.14.31.31.31
 
Im the OT 2011 OT: Arc~ (Male)(English)(White)(64673) .didnt see anything i want atm.

EDIT:Wrong info on Flareon.no superpower.read somone else's Flareon instead xP.Fixed
 
Update

133.png
Bag_Pok%C3%A9_Ball_Sprite.png
DW Shiny Eevee|Modest|31.26.30.30.30.30 HP Fight(Curse/Wish)(Hatched at Black City)

133.png
Bag_Pok%C3%A9_Ball_Sprite.png
DW Eevee|Modest|31.26.30.30.30.30 HP Fight(Curse/Wish)(Hatched at White Forest)
 
I've got some more pokes since last time so I figured I'd try again:

I like:

DW Espeon(France)|Timid|31.14.30.30.30.30 HP Fight

I can offer:


Shiny Gyarados - Adamant
Intimidate
31/31/31/31/30/31 (HP Electric 70)
UT

Shiny Skarmory - Impish
Keen EYe
31/31/31/31/31/31
UT

Shiny Machop -Adamant
No Guard
31/31/31/31/31/31
eg move: bullet punch
UT

Shiny Azelf - Timid
31/31/31/31/31/31
UT
Move: Stealth rock

Shiny Gligar - Immunity (Dream World)
31/31/31/01/31/31, Impish
Egg Moves: Poison Tail, Double-Edge, Baton Pass, Agility
OT: Infi ID: 48660 fully redis

Movie Victini
31/31/31/31/31/31, Adamant
Special Moves: V-Create, Fusion Flare, Fusion Bolt, Searing Shot
OT: Japanese letters. ID: 04161 fully redis.

Shiny Kyurem Pressure
31/02/31/30/31/30 HP Fire 70, Timid
OT: Infi ID: 32080 fully redis

Larvesta -Flame Body
31/15/30/31/30/30 HP Rock 70, Timid

Shiny Vaporeon
Bold
31/31/31/31/30/31 (HP Electric 70)
UT@Level 100 or EV'd 248 HP / 252 Def / 8 SpD (Standard EVs and moveset)

Shiny Lucario
Adamant
31/31/31/31/31/31
UT@Level 100 or 252atk/4Sp.Def/252 atk

Shiny Scizor
Adamant
31/31/31/31/31/31
Special Moves: Roost, Bug Bite, Superpower
OT: Arren
UT@Level 1 or EV'd 252 HP / 40 Atk / 216 SpD @ Level 100

Shiny Gible
Jolly 31/31/31/31/31/31
Special Moves: Stealth Rock and Outrage
OT: Spunk
UT@Level 1

Shiny Zapdos
Timid 30/15/30/31/31/31 (HP ICE 70)
Special Moves: Roost and Heat Wave
OT: Mat
UT@Level 100 or EV'd 192 HP / 64 Def / 252 Spe

Shiny Swampert
Relaxed 31/31/31/31/31/0 (I believe; if you're interested in it, I'll check the exact IV's again to make sure)
Special Moves: Stealth Rock
OT: Misty
UT@Level 100 or EV'd 240 HP / 216 Def / 52 SpD

Solosis - Quiet
Magic Guard
31/31/31/31/31/0

Shiny Tirtouga - Adamant
Solid Rock
31/31/31/31/31/31

Timburr - Brave
Guts
31/31/31/26/31/0
Egg moves: Drain punch, mach punch

Exeggcute
Harvest
31/31/31/31/31/30 HP Ice 70, Modest
OT: Mat ID: 30160 fully redis

Shiny Terrakion
31/31/31/x/31/31, Jolly
OT: Henry ID: 14081 fully redis

Shiny Virizion
31/31/31/x/31/31, Jolly
OT: Henry ID: 14081 fully redis

Jolteon - Quick Feet (DW)
30/30/30/31/31/31 HP Ice 70, Timid
OT: Mat ID: 30160 fully redis

Golett - Iron Fist
31/31/31/1/31/31, Adamant

Swablu - Cloud Nine (DW)
31/31/31/31/31/31, Adamant

Cofagrigous - Mummy
31/23/30/30/30/30 HP Fight 70, Modest

Sigilyph - Magic Guard
31/17/31/31/31/31, Bold
Egg Moves: Roost, Stored Power, Psycho Shift
OT: kobo1d ID: 26319 fully redis

Shiny Yamask - Mummy
31/00/31/31/31/31, Sassy
Egg Moves: Disable
OT:Infi ID: 32080 fully redis

Heatran Lv50 UT
OT : DRKMSTR
Modest | Flash Fire | Male
31/15/30/31/31/31
HP Ice 70
(No Redis)
Special Move: Stealth Rock

Heatran Lv50 UT
OT : DRKMSTR
Modest | Flash Fire | Female
31 | 26 | 31 | 30 | 31 | 31
HP Grass 70
Special Move: Stealth Rock
(No Redis)

Shiny Heatran
ID: 25100) (OT: Chevar)
Timid
31/22/30/31/31/31
HP: Ice 70
(No Redis)
Special Move: Stealth Rock

Kaphotic's Shiny Thundurus - Prankster
Timid
31/18/30/31/31/31 (HP ICE 70)

Newt's Latios http://www.smogon.com/forums/showthread.php?t=65367
Timid 31/6/31/30/31/30
Hp Fire 70
UT or 252spe 252sp a 4hp
Fully Redis if you link his thread
Shiny Staryu
Timid
31/30/31/30/31/30 (HP Fire 70)
UT Level 1
OT: Jake

Bond's Bulbasaur ♂
OT: Mat ID: 30160
Ability: Cholorophyll (DW) // Nature: Modest
IVs: 31/30/31/30/31/30 (HP Fire 70)
EVs: UT LVL 10
Egg Moves: None
Rights: Fully Redistributable
Cloning Method: fakeGTS

Mattj's Landorus nn: Goron
IV: 31/30/31/x/30/31
nature jolly - ability sand force
Evd version: 252attk/4def/252Spe
OT : mattj ID: 16440
Obtained: caught at abundant shrine
Available as: Lvl. 100 evd. / Fully redis
*In a repeat ball, Notes cloned using ar by jirachi

Jirachi (ジラ-チ)
Careful
31/31/31/6/31/31
OT: タナバタ
Moves: Iron head, fire punch
Level 5 UT
No Redis

Shiny Rotom
Modest
31/31/31/31/31/31
Special Move: Pain split
OT: Andy:)
No Redis

Shiny Larvitar
Sassy
31/31/31/31/31/31
Special Move: Stealth Rock
OT:Andy:)
No Redis

Shiny Rotom
Timid
31/26/31/30/31/30 (HP Fire 70)
OT:Zidane
Fully Redis

Shiny Vulpix - Drought (DW) Female
Timid
30/30/31/30/30/30 (HP Fighting 70)
OT:Twisted
Fully Redis

Poliwag - Swift Swim (DW) Male
Modest
31/30/31/30/31/31 (HP Grass 70)
OT: Twisted
Fully Redis

Shiny Litwick - Flash Fire
Modest
30/30/31/30/30/30 (HP Fighting 70)
OT:Twisted
Fully Redis
 
hi, i am new to this site. i really want to do some competitive wifi battling and unfortunately my action replay requires a usb for this generation to work and i just don't have it :(

would you be kind enough to offer me just 6 pokemon for free to use for battling.
i'd promise to do whatever it takes to repay you whether its returning the favor in the long run or battle you for it. Hopefully along the way, we can build a friendship
 
For this ill offer you 2 flawless UT DW pokemon: poochyena and blitzle for this:

133.png
Bag_Pok%C3%A9_Ball_Sprite.png
DW Shiny Eevee|Modest|31.26.30.30.30.30 HP Fight(Curse/Wish)(Hatched at Black City)
 
Disaster Movie got me hype up.add the discovery of Absol on Mt.Coronet just tickle my fancy for these. xD

359.png
Bag_Ultra_Ball_Sprite.png
Absol|Mt.Coronet|Adamant|31.31.20.31.31.31

359.png
Bag_Premier_Ball_Sprite.png
Absol|Mt.Silver|Jolly|31.31.21.31.31.31

359.png
Bag_Moon_Ball_Sprite.png
Absol|Whirl Island|Naughty|31.31.31.31.31.31

359.png
Bag_Love_Ball_Sprite.png
Absol|Tohjo Fall|Adamant|31.31.31.3.31.31

359.png
Bag_Dusk_Ball_Sprite.png
Absol|Great Chasm|Lonely|31.31.31.30.31.31
 
Status
Not open for further replies.
Back
Top