Hi. I'm interested in:
Kurt's Shiny Thundorus :D
Timid
IV: TBD (HP Ice)
EV: 4/0/0/254/0/252
OT: Kurt
ID: 00007
AR Cloned by me
Linkino's Shiny Timid Latias
OT: Space
ID: 09105
IVs: 31/6/31/30/31/30 HP Fire
Reuniclus NN:Glubulus
Male Lv.100 Shiny
Bold Magic Guard
Leftovers
OT: Jim ID: 42521
IV: 31/17/31/31/31/31
EV: 252 HP/ 252 SpA/ 4 SpD
Moveset: Calm Mind, Psyshock, Shadowball, Recover
AR Cloned by me
I can offer:
Shiny Gyarados - Adamant
Intimidate
31/31/31/31/30/31 (HP Electric 70)
UT
Shiny Skarmory - Impish
Keen EYe
31/31/31/31/31/31
UT
Shiny Machop -Adamant
No Guard
31/31/31/31/31/31
eg move: bullet punch
UT
Shiny Azelf - Timid
31/31/31/31/31/31
UT
Shiny Gligar - Immunity (Dream World)
31/31/31/01/31/31, Impish
Egg Moves: Poison Tail, Double-Edge, Baton Pass, Agility
Movie Victini
31/31/31/31/31/31, Adamant
Special Moves: V-Create, Fusion Flare, Fusion Bolt, Searing Shot
Shiny Kyurem Pressure
31/02/31/30/31/30 HP Fire 70, Timid
Larvesta -Flame Body
31/15/30/31/30/30 HP Rock 70, Timid
Shiny Vaporeon
Bold
31/31/31/31/30/31 (HP Electric 70)
UT@Level 100 or EV'd 248 HP / 252 Def / 8 SpD (Standard EVs and moveset)
Shiny Lucario
Adamant
31/31/31/31/31/31
UT@Level 100 or 252atk/4Sp.Def/252 atk
Shiny Scizor
Adamant
31/31/31/31/31/31
Special Moves: Roost, Bug Bite, Superpower
OT: Arren
UT@Level 1 or EV'd 252 HP / 40 Atk / 216 SpD @ Level 100
Shiny Gible
Jolly 31/31/31/31/31/31
Special Moves: Stealth Rock and Outrage
OT: Spunk
UT@Level 1
Shiny Zapdos
Timid 30/15/30/31/31/31 (HP ICE 70)
Special Moves: Roost and Heat Wave
OT: Mat
UT@Level 100 or EV'd 192 HP / 64 Def / 252 Spe
Shiny Swampert
Relaxed 31/31/31/31/31/0 (I believe; if you're interested in it, I'll check the exact IV's again to make sure)
Special Moves: Stealth Rock
OT: Misty
UT@Level 100 or EV'd 240 HP / 216 Def / 52 SpD
Kurt's Shiny Thundorus :D
Timid
IV: TBD (HP Ice)
EV: 4/0/0/254/0/252
OT: Kurt
ID: 00007
AR Cloned by me
Linkino's Shiny Timid Latias
OT: Space
ID: 09105
IVs: 31/6/31/30/31/30 HP Fire
Reuniclus NN:Glubulus
Male Lv.100 Shiny
Bold Magic Guard
Leftovers
OT: Jim ID: 42521
IV: 31/17/31/31/31/31
EV: 252 HP/ 252 SpA/ 4 SpD
Moveset: Calm Mind, Psyshock, Shadowball, Recover
AR Cloned by me
I can offer:
Shiny Gyarados - Adamant
Intimidate
31/31/31/31/30/31 (HP Electric 70)
UT
Shiny Skarmory - Impish
Keen EYe
31/31/31/31/31/31
UT
Shiny Machop -Adamant
No Guard
31/31/31/31/31/31
eg move: bullet punch
UT
Shiny Azelf - Timid
31/31/31/31/31/31
UT
Shiny Gligar - Immunity (Dream World)
31/31/31/01/31/31, Impish
Egg Moves: Poison Tail, Double-Edge, Baton Pass, Agility
Movie Victini
31/31/31/31/31/31, Adamant
Special Moves: V-Create, Fusion Flare, Fusion Bolt, Searing Shot
Shiny Kyurem Pressure
31/02/31/30/31/30 HP Fire 70, Timid
Larvesta -Flame Body
31/15/30/31/30/30 HP Rock 70, Timid
Shiny Vaporeon
Bold
31/31/31/31/30/31 (HP Electric 70)
UT@Level 100 or EV'd 248 HP / 252 Def / 8 SpD (Standard EVs and moveset)
Shiny Lucario
Adamant
31/31/31/31/31/31
UT@Level 100 or 252atk/4Sp.Def/252 atk
Shiny Scizor
Adamant
31/31/31/31/31/31
Special Moves: Roost, Bug Bite, Superpower
OT: Arren
UT@Level 1 or EV'd 252 HP / 40 Atk / 216 SpD @ Level 100
Shiny Gible
Jolly 31/31/31/31/31/31
Special Moves: Stealth Rock and Outrage
OT: Spunk
UT@Level 1
Shiny Zapdos
Timid 30/15/30/31/31/31 (HP ICE 70)
Special Moves: Roost and Heat Wave
OT: Mat
UT@Level 100 or EV'd 192 HP / 64 Def / 252 Spe
Shiny Swampert
Relaxed 31/31/31/31/31/0 (I believe; if you're interested in it, I'll check the exact IV's again to make sure)
Special Moves: Stealth Rock
OT: Misty
UT@Level 100 or EV'd 240 HP / 216 Def / 52 SpD