• Check out the relaunch of our general collection, with classic designs and new ones by our very own Pissog!

Under Construction,Delaying,and Bacon Strips :D

Status
Not open for further replies.
in exchange for larvesta id like this EGG please
Bond267's Flawless Timid Deino Egg

image.php


OT: Mat
ID: 30160
Available as UT or EGG form.
AR Cloned by me

didnt see anything else sorry
 
There is nothing that I want. However, I may need EV training very soon since, so I'll be sure to contact you if you're willing.
 
579.png


31/30/31/31/31/0
Reuniclus @ Leftovers/Life Orb
Modest Nature
Magic Guard Ability
Egg Moves:
-Calm Mind
-Psychic
Trained Moveset:
-Recover
-Calm Mind
-Psychic
-Focus Blast



i can offer


chimchar
Shiny Naive / Blaze
30/31/30/31/31/31 - HP Ice 70
Fake Out / Encore / Counter / Helping Hand


pineco
impish
perfect

Heatran
Level: 50
Ability: Flash Fire
Nature: Quiet
IVs: 31/31/31/30/31/31
EVs: Untrained
Hidden Power Electric 70
Moves: Eruption | Magma Storm | Earth Power | Ancient Power
OT/Oblivia
ID/03060
2/28/2010
Pokemon Ranger


Machop
Nature: Adamant Ability: No Guard
Hidden Power: No Location:
IVs: 31 HP | 31 Atk | 31 Def | 31 SpA | 31 SDef | 31 Spd
Avaiable UT LV 1
Bullet Punch



239.png

Nature: Adamant Ability: Static
Hidden Power: None Location:
IVs: 31 HP | 31 Atk | 31 Def | 31 SpA | 31 SDef | 31 Spd
Avaiable LV1 UT
Cross Chop


Shiny Scyther
(ID - Smogon - 22704) (OT)
123.png
212.png

Nature: Adamant Ability: Techinician
Hidden Power: None Location: Viridian Forest
IVs: 31 HP | 31 Atk | 31 Def | 31 SpA | 31 SDef | 31 Spd
Avaiable LV1 UT
Baton Pass
I know that you might be sick of these but hey, it's shiny :)

Shiny Eevee
(ID - Smogon - 22704) (OT)
133.png
136.png
197.png

Nature: Careful Ability: Run Away
Hidden Power: None Location: Celadon City
IVs: 31 HP | 31 Atk | 31 Def | 31 SpA | 31 SDef | 31 Spd
Avaiable LV1 UT
Curse, Yawn, Curse


Shiny Koffing
(ID - Smogon - 22704) (OT)
109.png

Nature: Bold Ability: Levitate
Hidden Power: None Location: Battle Factory
IVs: 31 HP | 31 Atk | 31 Def | 31 SpA | 31 SDef | 31 Spd
Avaiable LV1 UT
Will O wisp, Curse

Shiny Murkrow
(ID - Smogon - 22704) (OT)
198.png

Nature: Naive Ability: Super Luck
Hidden Power: Grass 70 Location: Cinnabar Island
IVs: 31 HP | 30 Atk | 31 Def | 30 SpA | 31 SDef | 31 Spd
Avaiable LV1 UT
Brave Bird
He has a badass hat, don't f***ing mess with him ;)




Gastly
IVs: 31/31/31/31/31/31
Newt's Sceptile (male)Nature: Timid
Ability: Overgrow
IV: 31/6/30/31/31/31 (HP ice 70)
Egg Moves: Leaf Storm
Availability: lv 50 ev trained 4 hp/ 252 atk/ 252 spe

shiny Adamant larvitar Guts
31/31/31/31/2/11

MATTJs Modest suicune



Lv 1 Eevee
Modest
31/31/31/31/31/31



iambaney's starly
adamant male
ot-baneana
level 1
iv-31/31/31/31/31/31
-tackle
-growl
-pursuit
-aerial ace
 
CMT for this please? I don't really have much in my thread right now though and all of it is on a Gen 4 game if that's alright, haha.

Bond267's Flawless Timid Deino Egg

image.php


OT: Mat
ID: 30160
Available as UT or EGG form.
AR Cloned by me
 
In response to your cmt, i'll take
Xelite's #549 - Lilligant ★
(ID: 52957 | OT: JOE)
549.png
nestsb5.png

Ability: Chlorophyll | Nature: Timid
IVs: 31 | 19 | 30 | 31 | 30 | 30 [HP 70]
EVs:6 HP / 252 SAtk / 252 Speed
Moves: Toxic, Hidden Power, Stun Spore, Solarbeam
Available at: Level 100 EVd

Fenix54's Larvesta
636.png

Nature: Timid Ability: Flame Body
Hidden Power: Ice 70 Location: Route 3 Date : March, 3. 2011
IVs: 31 HP | 30 Atk | 30 Def | 31 SpA | 31 SpD | 31 Spe
Avaiable as UT Level 1
Morning Sun
 
You can do it yourself. Click edit, then advanced options, then change the Post's title. That will change the thread's title.
 
CMT thread for these:

Charmander

Ability:Solar Power
Nature: Modest
OT:Mat
ID:30160
IV:
AR cloned by me

Torchic

Ability:Speed Boost
Nature: Adamant
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me
Eeveelutions

Jolteon

Ability:Quick Feet
Nature: Timid/Naive/Hasty/Naughty
OT:Mat
ID:30160
IV:
AR cloned by me

Flareon

Ability:Guts
Nature: Modest/Brave/Careful/Adamant
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me


Vaporeon

Ability:Hydration
Nature: Bold
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me

Espeon

Ability:Magic Bounce
Nature: Mild
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me

Umbreon

Ability:Inner Focus
Nature: Sassy
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me

Leafeon

Ability: Chlorophyll
Nature: Jolly
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me

Glaceon

Ability:Ice Body
Nature: Timid
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me

Arceus

Ability:Multitype
Nature: Adamant/Calm
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me
 
Their Bond267's,but it was given to another site's giveaway,found out about them yesterday,traded fully redis for them,hence i wasnt here yesterday until really late :)

if you like,i'll do 3 of mine for yours :)
 
Status
Not open for further replies.
Back
Top