• Check out the relaunch of our general collection, with classic designs and new ones by our very own Pissog!

Under Construction,Delaying,and Bacon Strips :D

Status
Not open for further replies.
Leafeon
470.png

Ability: Chlorophyll
Nature: Jolly
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me

CMT for this beauty.
 
In response, I'd like
Shiny Zoroark

571.png


OT: Alex
ID: 61657
IV: 31/31/31/30/31/31 HP Electric
EV: 6/0/0/252/0/252
AR Cloned by me
 
Reply to CMT for Litwick:

Vulpix
(ID - Alex - 61657) (Female)(OT)
37.png

Nature: Timid Ability: Drought
Hidden Power: Ice 70 Location: Route 3 Date : February, 18. 2011
IVs: 31 HP | 30 Atk | 30 Def | 31 SpA | 31 SpD | 31 Spe
 
This in response to your CMT
UT lvl 1 please

579.png


31/30/31/31/31/0
Reuniclus @ Leftovers/Life Orb
Modest Nature
Magic Guard Ability
Egg Moves:
-Calm Mind
-Psychic
 
how many pokemon are you willing to EV Train for the Clefable?

and sorry buddy, can't call dibs on the crobat. but literally, i was making so many giveaways, the admins were tired of having to close them all, so i had to start making the giveaways in my trade thread. that didn't work very well
 
For my Kingdra, I'd like to have this one:

Vulpix
(ID - Alex - 61657) (Female)(OT)
37.png

Nature: Timid Ability: Drought
Hidden Power: Ice 70 Location: Route 3 Date : Februar, 18. 2011
IVs: 31 HP | 30 Atk | 30 Def | 31 SpA | 31 SpD | 31 Spe
 
Are any of em EV'd? What are Charmander's IVs?

I def want a timid Eevee.

Edit:

Also, what site? How do you know they're not hacked? :\
 
its from PokemonGTS. from ReignOfComputer, who doesn't like hack very much.
Raist,if you want it evd, i'll be glad to apply your spread to it :)
 
Please CMT for:
Bond267's Flawless Timid Deino Egg

image.php


OT: Mat
ID: 30160
Available as UT or EGG form.
AR Cloned by me

Torchic
255.png

Ability:Speed Boost
Nature: Adamant/Jolly/Timid
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me


Flareon
136.png

Ability:Guts
Nature: Modest/Brave
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me


Vaporeon
134.png

Ability:Hydration
Nature: Bold/Modest
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me

Espeon
196.png

Ability:Magic Bounce
Nature: Modest
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me

Umbreon
197.png

Ability:Inner Focus
Nature: Careful
OT:Mat
ID:30160
IV:31/31/31/31/31/31

Leafeon
470.png

Ability: Chlorophyll
Nature: Jolly
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me

Glaceon
471.png

Ability:Ice Body
Nature: Timid
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me

Arceus
493.png

Ability:Multitype
Nature: Adamant/Modest
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me

Exeggcute (Female)
102.png

Ability:Harvest
Nature: Modest
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me
 
Cmt for this

Shiny vulpix
Nature: Timid Ability: Drought
Hidden Power: Ice 70 Location: Route 3 Date : Februar, 18. 2011
IVs: 31 HP | 30 Atk | 30 Def | 31 SpA | 31 SpD | 31 Spe
AR Cloned by me
 
In response to your CMT, can I get that timid magic bounce Espeon for shiny Deino? Also, those mons with the OT Mat (30160 ID) are Bond697's I believe, in case you didn't know. :p
 
CMT for:
Also, what are the redis rights for the espeon?

Xelite's #549 - Lilligant ★
(ID: 52957 | OT: JOE)
549.png
nestsb5.png

Ability: Chlorophyll | Nature: Timid
IVs: 31 | 19 | 30 | 31 | 30 | 30 [HP 70]
EVs:6 HP / 252 SAtk / 252 Speed
Moves: Toxic, Hidden Power, Stun Spore, Solarbeam
Available at: Level 100 EVd
AR Cloned by me

Espeon
196.png

Ability:Magic Bounce
Nature: Mild/Modest/Timid <= modest natured please!
OT:Mat
ID:30160
IV:31/31/31/31/31/31
AR cloned by me
 
Update:

Bulbasaur (male)
1.png

Ability:Chlorophyll
Nature: Modest/Careful/Timid/Mild/Calm/Bold
OT:Mat
ID:30160
IV:HP Fire 70
AR cloned by me
 
cmt for

Escavalier
589.png

Male Lv.100
Adamant Shell Armor
Shiny
Held Item: Leftovers
OT: Jim ID: 42521
IVs: 31/31/31/24/31/31
EVs: 248 hp/ 24 atk/ 236 SpD
Moveset: Swords Dance, Megahorn, Iron Head, Pursuit
AR Cloned by me

Durant NN:THEM!
632.png

Male Lv.100
Jolly Hustle
Shiny
Held Item: Life Orb
OT: Jim ID: 42521
IVs: 31/31/31/1/31/31
EVs: 252 atk/ 4 def/ 252 speed
Moveset: Hone claws, X-Scissor, Stone Edge, Thunder Fang
AR Cloned by me
 
Status
Not open for further replies.
Back
Top