CMT for the naive shiny dratini?
CMT for this
(★)
#079 Slowpoke
OT: Kai | ID No.: 50182 | Gender: Male
Nature: Modest | Ability: Regenerator | Type: Water-Psychic
Hidden Power: N/A
IV: 31 /28/31/31/31/31
EV: UT | Level: 1
Moves: Yawn | Flamethrower | Scald | Rain Dance
Note: Tesseraction gave me semi-redistribution rights to this pokemon. Mentioned with his thread here. I can trade it but you can't.
CMT for this
Suicune lvl 40 -ut (OT: Zelenia ID: 16040)
Pressure | Route 25
Moon Ball|Timid |30 / 18 / 31 / 30 / 31 / 30 | FIRE 70 | Non-Redi | CP for ShinySuicune